Description: Concord participated in both the Power Distribution System and Signaling System installation. Electrical cabling work for Dubai Metro Project-station depot, AFC,PSD, Trackside 33 kv , Trackside PDS.
The Red Line consists of 52km, 29 stations and 2 Depots and the Green Line with 18 stations and 1 Depot over 23km.
Completed in 2009/2011 respectively.