Description: Tunnelling Electrical Distribution and Lighting System Electrical installation for KPE Expressway consisting of 8.75km underground expressway.
Completed in 2012.
Description: Installation of signalling related equipment
Description: Installation of Electrical, equipment, assist SAT & PAT and assist testing & commissioning. Project duration (April 2015 - August 2016).
Completed in 2016.
Description: Installation, testing and commissioning of Power Rail, Power Distribution System and Automatic Train Control System for Sepang (KLIA) PTC-III. The KLIA Track Transit System consist of 2 stations, running over 1.2 km.
Completed in 1998.
Description: Power Distribution System, Signalling, Communication & Platform Screen Door.
Completed in 2011.
Description: Installation of Power Distribution System Tie-in Work
Description: Complete electrical and instrumentation system including earthing system, lightning protection system, power cable circuit cooling system and tunnel ventilation system for Tuas Terminal Station, Pioneer Terminal Station and cable tunnels.
Completed in 2006
Description: Electrical & Instrumentation Works at Tuas Incineration Plant.
Completed in 2005
Description: Erection of HT & LT Switchgear, Transformer, Control Panel, Batteries, UPS, laying of 66kV HT cable complete with Termination, laying of 300km HT, LT & Control cables, 15km cable ladder and related work.
Completed in 2001
Description: Supply, Installation, Testing & Commissioning of Electrical & Instrumentation Works for Filter House.
Completed in 2000
Description: Installation of 230kV gas-insulated switchgears, 22 kV and 38kV ter-switchgears, shunt reactors, earthing resistors and transformer, relay and control panels, high voltage and low voltage cables, cable supporting system and termination of high voltage and low voltage cables.
Completed in 1998
Description: Electrical Installation of 400kV and 230kV Switchgear, Ancillary Equipment and Accessories for Labrador and Ayer Rajah Sub-station.
Completed in 1996
Description: Installation of Equipment, Cable Support, MV, LV & Instrument Cable & Tubing for 3 Boilers.
Description: Installation and Testing of Electrical and Instrumentation work for Jimah Power Plant at Port Dickson.
Description: Construction, erection & commissioning of combined cycle power plant. Consists of 2 gas turbine and 1 steam turbine.
Completed in 2002
Description: Electrical And Instrumentation erection for Onshore and Offshore. Project duration (Apr 2013 - July 2014)
Completed in 2014
Description: Electrical Works For Non Process & Utilities Facilities
Completed in 2009
Description: Electrical & Instrumentation Works
Description: Lighting Fittings, SSO, Isolators, Cable Support, LV Cables, Termination Work, Pipe Works, Lighting & Earthling, etc.
Completed in 2007.
Description: Complete Electrical works, telephone system, data system & CCTV System
Description: Design, supply & installation of Tap-off Units, DBs, Transformer & Cabling for Hookup of Wafer Fab Tools.
Completed in 2009.
Completed in 2007
Description: Design, supply and installation of Electrical Services for Fit-up consisting of HT Cabling, Busbar System, PNL Panels & Main Switchboard, Tap-off units, DBs, Transformer & Cabling for Hookup of WaferFab Tools.
Completed in 2010
Description: Engineering, Procurement and Construction of Electrical Services for Fit-up consisting of Transformers, Generators, HT Cabling, Busbar System, Electrical Main and Sub Panels, Main Switchboard, Tap-off units, & Cabling for Hookup of WaferFab Tools.
Completed in 2011
Description: Electrical & Instrumentation Works at Telin Data Centre.
Completed in 2017
Description: Electrical and instrumentation works for Floating Production, Storage & Offloading Vessel (FPSO).
Electrical and instrumentation works for Floating Production, Storage & Offloading Vessel (FPSO).
Contact Us | Sitemap Copyright © 1996-2010 Concord Corporation Pte Ltd